- #Revit project template file location how to
- #Revit project template file location manual
- #Revit project template file location full
- #Revit project template file location software
The manual movement tools of the Project Base Point, Survey Point, and Royal North rotation are used to fix a poor coordination job, not to set the project correctly from the beginning. Once the link has been loaded into the project and its base point positioned in the Revit origin (for example, via a roto-translation of the link), acquiring coordinates from the link itself is sufficient.
Typically, when starting from a survey, it’s the surveyor’s responsibility to provide a file (CAD or Revit) with the GIS coordinates already entered and (theoretically) already established in the BEP.
#Revit project template file location software
Coordinated work between disciplines or multiple buildings (in the same field that require software interoperability) always require positioning and a set of shared coordinates.Ī project’s correct positioning constitutes a base point established upstream. In general, shared coordinates / geographic positioning aren’t always necessary for a good design approach. Instead, create a template (also if there is information still needed), or take a standard Revit template and fill it out during the project development with all the aforementioned settings, always keeping an eye on the “beacon” of the LoD and the project’s BIM Use.
#Revit project template file location full
Revit is a database that keeps track of everything (even internal errors), so we would end up with a file that’s much heavier than normal and full of corruptions from the previous project(s). Most importantly, you should not rename and empty a previous Revit project of its 2D / 3D elements to begin a new project. These templates will then be maintained over time according to the evolution of families and design style. Ideally, we would have standard templates for each type of building usually designed. In the event that the current project is similar to a previous one, we can begin by extracting the old project’s template. Without a BEP, we should know the project path well in order to accurately predict what needs to be inserted into the project file. The step that involves setting up a good template is equally fundamental and delicate.
This file is initially loaded onto the template to set Coordinates, Grids and Levels for each discipline and building. URS (Unique Reference System): Only a blank Revit file containing the shared project coordinates, grids, and levels for all disciplines and buildings in the project are needed. A URS coordination file and shared coordinates are necessary.
Otherwise, it’s better to have a URS coordination file with shared coordinatesĭesign of multiple buildings in the same lot: each building has its own package of files (one for each discipline) and all files are stored inside an empty Revit file (Federated Model). We only recommend single-file modeling for very small projects. Multi-Discipline Design: decide whether to model all disciplines using the same file or separate them into different files. If we do not have the BEP to guide us, it’s important to carefully consider the best way to set up the Revit project before modeling that is, whether it is solely a single file or several files linked together.ĭesign of a single discipline: there is no specific setting, one Revit file is enough.
#Revit project template file location how to